Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13655826

- Product Categories
- Friendly Links
Information Name: | Aluminum coating equipment, Sino painting equipment (certified), painting equipment |
Published: | 2015-05-16 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Electrostatic powder coating equipment cleaning maintenance cleaning and maintenance 1.1 cleaned once a week for the powder system to ensure smooth operation. 1.2 should change powder off the control power of the gun, the injector for powder systems, hoses for the powder keg to clean up. 1.3 regularly check the electrostatic spray painting equipment to clean aluminum parts, wear and tear that is found in the exchange. Cleaning for the powder system 2.1 Close the generator control unit. 2.2 The powder injector and off for the powder keg. 2.3 The amount of powder pipe, tube and lose concentration powder and powder injector tube disconnected. 2.4 with a compressed air jet ejected clear powder injectors, powder hoses and guns. 2.5 Open the lid for the powder, the powder barrel for thorough cleaning, smoke powder pipe (using compressed air). Painting equipment process layout design quality, the use of coating production lines is critical. If the coating equipment process layout properly, even though the production of a single device, no matter how, the entire coating line is not good to use. Painting equipment process layout now common typical errors are listed below: (4) 1-21, yield less than the design of the Programme: Some design does not consider painting equipment hanging manner, without considering hanging pitch coating equipment lines, irrespective of the downhill, turn the interference level, without regard to the rejection rate of production time, painting equipment utilization, product peak production capacity. Resulting in production to reach the design program. 2, coating equipment processing time is not enough: some designed to reduce the cost of water curtain spray booth painting equipment, by reducing the process time to achieve their goals. Common, such as: Before coating production lines handling the transition period of time is not enough, resulting in a string fluid; heating time is not considered when cured coating equipment, resulting in curing bad; painting leveling time is not enough, not enough to cause the film leveling; after curing, cooling is not enough, painting (or lower member) workpiece overheating. Aluminum coating equipment, Sino painting equipment (certified), painting equipment provided by Qu Sino Painting Equipment Co.. Linqu Sino Painting Equipment Co. (www.wfjn.com) (www.wfjn.com) (www.wftcsw.com) is an industry leader in Shandong Weifang, industrial automation control systems and equipment, over the years, the company implementing the scientific management , innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Sino painting equipment in leadership with the staff warmly welcome all inquiries negotiations to create the painting equipment Sino better future. |
Admin>>>
You are the 48720 visitor
Copyright © GuangDong ICP No. 10089450, Qu Sino Painting Equipment Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 48720 visitor
Copyright © GuangDong ICP No. 10089450, Qu Sino Painting Equipment Co. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility